Part 30: Construction of the Centre for Computing and Engineering

Donor Wall Completed


Mar 2, 2005
Installation of the light-boxes and the wiring haresses.

Mar 2, 2005
Side-view of the installation of the light-boxes nearing completion.

Mar 8, 2005
Installation of the flourescent light-bulbs begins.

Mar 9, 2005
Installation of the front faces begins.
The bigger your donation, the higher your name is placed on the wall.

Mar 10, 2005
Side view as the work continues.

Mar 14, 2005
Front-faces nearly completed.

Mar 15, 2005
Some overtime work to finish it off.

Mar 28, 2005
The projection screen lowered in front of the Donor Wall. The
original design called for the Wall "converting" to a screen
by having the back-light dimmed.

Photography and Commentary: Luis Fernandes.

Camera details: 5 megapixel Canon S60 SureShot.

Other Notes: Original photos have a resolution of 5 M pixels. Panoramas are created using Adobe Photoshop to “stitch-together” 2 or more images and optionally touched-up to fill blank spaces.