 Jul 19, 2004, 2:35pm, Day 1: The moving truck is
maneuvered into the EPH loading-dock.
|
 Jul 19, 2004, 2:35pm, Day 1: The
moving-crew fills the loading-dock with benches and the truck is
loaded.
|
 Jul 19, 2004, 4:05pm, Day 1: Due to mis-communication, the
loading-dock and freight-elevator in ENG are not available and so
the desks have to be unloaded at a side entrance along
Dalhousie. There was also a delay while the movers waited for
their hard-hats.
|
 Jul 19, 2004, 5:35pm, Day 1:
Benches that don't fit in the truck are moved manually. Can a
lab-bench travelling the wrong way, up a one-way street get a
ticket?
|
 Jul 19, 2004, Day 1: The good news: the benches fit in the
passenger elevator (otherwise they would have to be moved up the
stairs); the bad news: only a single passenger elevator is
operational and (wait, it gets worse) only a single 6' bench fits
in the elevator. Yes, it was a long, slow day.
|
 Jul 19, 2004, Day 1: At the end of the day, the tables
reach their destination. The maps, showing the table-layout,
taped to each desk made their placement easy and accurate.
|
 Jul 20, 2004, Day 2: All the gorgeous Violent Purple
cabinets are moved on this day, in addition to a few remaining
tables.
|
 Jul 20, 2004, Day 2: The crew walks down to the loading
dock as the truck arrives.
|
 Jul 20, 2004, Day 2: The truck pulls into the ENG loading
dock.
|
 Jul 20, 2004, Day 2: The truck is ready for
unloading. The man on the right is the freight elevator
operator. Since the elevator has not yet been certified, a
qualified operator has to be present.
|
 Jul 20, 2004, Day 2: The furniture awaits loading into the
freight elevator, which can handle 3 desks at a time.
|
 Jul 20, 2004, Day 2: At the end of the day, all the desks
and cabinets are in place.
|
 Jul 20, 2004, Day 2: Group-shot of the crew from
Clifford Moving Services before they head home. The empty truck
is in the background.
|
.