Apr. 2, 2004, 12:40pm As the
bricks are added, the worker with the yellow helmet keeps the masons
supplied with mortar (from the white tower) which is mixed in the
trough below.
|

Apr. 2, 2004, 12:40pm A fresh
load of mortar is delivered.
|

Apr. 2, 2004, 12:43pm A long
way to go...
|

Apr. 5, 2004, 12:44pm The
third floor is (nearly) filled-in. HVAC enclosures on the roof are
quite massive.
|

Apr. 5, 2004, 12:46pm An
alternative to the elevator.
|

Apr. 5, 2004, 12:48pm North
bricks at ground-level completed. Closeup of the gantry that will
be used, instead of scaffolding, to carry the bricklayers.
|

Apr. 8, 2004, 12:43pm Looking
north, most of the seams are filled-in.
|

Apr. 8, 2004, 12:48pm A wide
view of the gantry as it inches upwards. The platform slides on the two vertical trusses.
|

Apr. 12, 2004, 12:40pm A
view, from Dalhousie Lane, of the gantry and the pulley system
used to lift bricks and mortar onto the gantry.
|

Apr. 12, 2004, 8:06pm A night shot.
|

Apr. 12, 2004, 8:09pm A night
shot from Church Street showing the wall-studs in the interior.
|

Apr. 13, 2004, 12:40pm A
Closeup of the siding that seals the glass to the concrete.
|

Apr. 13, 2004, 12:42pm The
entrance is still not completed.
|

Apr. 13, 2004, 12:43pm Some
sort of anti-terrorist barrier seen in the reflection of the
street-level glass. (I'm joking).
|

Apr. 13, 2004,
12:43pm Another reflection of the north-west face.
|

Apr. 13, 2004, 12:45pm That was fast...
|

Apr. 15, 2004, 12:40pm Work
begins on the south face.
|

Apr. 15, 2004, 12:44pm All
done, let's move on...
|

Apr. 15, 2004, 12:45pm A
closeup of the single-person carrier.
|

Apr. 23, 2004,
8:05pm Ground-level view (ignoring the rubble for the moment)
there's a good view of how far the interior is finished.
|

Apr. 23, 2004, 8:05pm The
concrete was cut and removed-- another oops?
|

Apr. 23, 2004, 8:06pm Another
view of the dig.
|

Apr. 23, 2004, 8:10pm All 4
floors are now walled and awaiting the moisture-barrier, insulation
and masonry.
|