Jan. 13, 2004, 12:40pm The
first panes of glass are mounted on the second floor and most of the
roof is completed. Compare the floor-to-ceiling height of the
fourth floor with that of the other floors. (Extremely cold
temperatures have made outdoor photography difficult during this
month.)
|

Jan. 18, 2004,
12:40pm Primary and secondary railings are mounted on all the
floors except the fourth. The ceiling still remains to be
completed at the northern edge. Blue gang-plank sticking out of
the second floor is used to load materials onto the upper floors.
|

Jan. 18, 2004, 12:40pm "Dry
Air" generators at the south end.
|

Jan. 20, 2004,
12:40pm Flatbed truck carrying 2 heat-exchanger (heating and
cooling) units to be installed on the south-east corner of the roof.
|

Jan. 20, 2004,
12:40pm Closeup of the 2nd heat-exchanger unit; there is one
heat-exchanger installed per floor.
|

Jan. 22, 2004,
12:43pm Gandalf the White on the ROTK poster, seen from the covered hoarding.
|

Jan. 22, 2004,
12:41pm Looking north along Church, a stone cutter works on a 2nd
floor ledge. Two more glass panels were added to the facade.
|

Jan. 22, 2004,
12:42pm Closeup of the stone cutter correcting a mistake in the concrete.
|

Jan. 28, 2004, 12:40pm Three
additional glass panes are mounted. Forms for the freight-elevator
shaft are visible on the roof.
|

Jan. 22, 2004,
12:42pm Closeup of the panes. Note the asymmetry in the pane heights.
|

Jan. 30, 2004,
12:40pm Vapour barrier installed on the bare concrete. Six rows of
brackets are visible protruding from the wall.
|

Jan. 30, 2004, 12:42pm The
ground-floor is enclosed in polyethelene for heat retention while
the interior work is performed. Mounting-brackets and glass panes are
visible on the second-floor.
|