April 1, 2003 to April 30, 2003

Apr. 10, 2003 12:45
PM Looking south-east at the excavation, through a window cut into
the hoarding running along Church Street.
|

Apr. 10, 2003 12:43
PM Looking east at the earthen ramp, through a window cut into the
hoarding running along Church Street.
|

Apr. 10, 2003 12:40 PM
Looking north-east at the excavation, through a window cut into the
hoarding running along Church Street. The drilling platform on
the left prepares the site for a crane.
|

Apr. 21, 2003 12:40 PM
The crane erector raising the Blue Crane's arm.
|

Apr. 21, 2003 12:45 PM
Closeup of the Blue Crane's arm installation.
|

Apr. 21, 2003 12:45 PM
Closeup of the crane-erector.
|

Apr. 21, 2003 20:05 PM
Looking north, the blue crane is completed; note de-watering system
pipes and the deconstructed earthen ramp.
|

Apr. 21, 2003 8:07 PM
Blue Crane over Church Street at dusk.
|

Apr. 23, 2003 12:38 PM
Looking south-east, both cranes ready to rock and roll.
|

Apr. 24, 2003 12:40 PM
Looking south, cement mixers beginto make deliveries to the south end
of the lot.
|

Apr. 24, 2003 8:04 PM
Finally!!!! The footings are poured.
|

Apr. 28, 2003 6:04 PM
Additional landscaping in the sub-basement.
|

Apr. 29, 2003 6:40 PM
The cranes at sunset, viewed from Dalhousie street.
|

Apr. 29, 2003 12:40 PM
Looking west at the south end of the lot, the some of the footings
are set and the forms removed.
|
Camera details: 3.2 megapixel Canon S30 SureShot with 3X
optical zoom; Av F2.8 - 8.0; Tv 1/1500 - 15 sec; ISO 50 - 800; manual
or automatic focus and light-metering capable.
Other Notes: Original photos have a resolution of 1600x1200
pixels. Panoramas are created using Adobe Photoshop to
"stitch-together" 2 or more images. Photos taken through the window
are Auto-Leveled then brightened.
Photography and Commentary: Luis
Fernandes.