March 1, 2003 to March 31, 2003
![]() Mar. 11, 2003 12:40 PM With all the drilling complete, only a few earth movers remain digging deeper along the east and wet sides of the north-end of the lot.
|
![]() Mar. 11, 2003 12:44 PM A wooden ramp/overpass is constructed on the sidewalk, covering a pipe (de-watering system) extending from the inside the lot to the gutter.
|
![]() Mar. 12, 2003 12:44 PM A close-up view of the ramp over the pipe on Gould Street sidewalk.
|
![]() Mar. 12, 2003 12:40 PM The excavation depth varies considerably along the length of the lot; the north end is the deepest.
|
![]() Mar. 12, 2003 12:40 PM A few measurements still being taken. Most of the excavation work is completed; the project has now gone out to tender and interested construction companies will bid on it.
|
![]() Mar. 20, 2003 12:40 PM All is quiet again.
|
![]() Mar. 21, 2003 4:53 PM A different perspective: 2nd floor of the Rogers building.
|
Camera details: 3.2 megapixel Canon S30 SureShot with 3X optical zoom; Av F2.8 - 8.0; Tv 1/1500 - 15 sec; ISO 50 - 800; manual or automatic focus and light-metering capable.
Other Notes: Original photos have a resolution of 1600x1200 pixels. Panoramas are created using Adobe Photoshop to "stitch-together" 2 or more images. Photos taken through the window are Auto-Leveled then brightened.
Photography and Commentary: Luis Fernandes.