Excavation 02: Centre for Computing and Engineering Construction

November 5, 2002 to November 31, 2002

The overhead perspective photos are taken from an unwashed third floor atrium window of the Rogers Communications Centre looking down Dalhousie Street.



Nov. 5, 2002 12:41 PM
Half of the lot excavated.

Nov. 12, 2002 12:52 PM
Excavation nearing completion.

Nov. 20, 2002 12:39
Excavation completed.



Nov. 7, 2002 12:45 PM
Excavation
The excavation site was formerly the garage that housed the delivery trucks for the Sears warehouse, now known as The Merchandise Lofts. Visible in the background, is the walkway over Church Street, connecting the East Quad (on the left) to the Rogers Centre (on the right).

Nov. 7, 2002 12:41 PM
Closeup
The garage basement at the south-east corner of the lot, on Dalhousie Street looking west, excavated to a depth of about 3 meters.


Nov. 20, 2002 12:40
A closeup taken through the fence, looking south, down the center of the lot.

Nov. 20, 2002 12:40
Another closeup taken through the fence of the north-west corner of the lot looking south.


Photography and Commentary: Luis Fernandes.